Changchun City Line 1 guide sign phase I project

Nov 19,2024

On June 7, 2016, the bid was made by Changchun Rail Transit Group, and the unit won the bid with 13.79 million yuan.


On June 7, 2016, the bid was made by Changchun Rail Transit Group, and the unit won the bid with 13.79 million yuan. Construction began on June 25, 2016, and was completed on September 30, 2016. It guided the road for the people of Changchun City, and then won the bid for 6.23 million Changchun Light Rail Line 8 guidance sign project and 2.62 million light rail 8 advertising light box project.

It has been praised by the leaders of Changchun Rail Group.Including all kinds of guidance signs in the public areas of 15 stations of Changchun Metro Line 1 project, within 500m outside the station and the parking lot of the depot and other areas to deepen the design, manufacturing, sample, factory test, transportation, installation, commissioning, warehousing and other intermediate processes, provide corresponding services and assume the required management responsibilities, including but not limited to:

Supply of goods

Guiding signage supply in public areas of 15 stations and car depot parking areas.

Deepening design of layout information, graphic information, structure and material technology of 15 new station signs.

Supply of professional maps for 15 new stations.

Supply of subway guidance signs (DIR-09C) within 500 meters outside the new 15-seater station.

Supply of corresponding spare parts and special tools.

System installation and commissioning

Installation of guiding signs in public areas and parking lots of 15 stations throughout the line.

Professional map installation.

Installation of subway guidance signs (DIR-09C) within 500 meters outside the station.

The installation and installation supervision of the system sign plate, including wiring, power distribution debugging, and control debugging until the full line is opened.

service

The secondary design of the whole line guiding sign system, and the interface processing of related professional stations.

The layout information and graphic information of 15 station signs on the whole line.

Professional map compilation, graphic design, site mapping, entrance and exit information and bus line station survey.

The secondary design and site investigation of the subway guidance sign (DIR-09C) within 500 meters outside the station.


Previous page

None

Next page

None